What does a roof replacement involve?
A replacement starts from the deck up. The crew strips every layer of old roofing, pulls the nails, and inspects the plywood or plank boards underneath. Soft, delaminated or rotted sections are cut out and replaced. Then the roof is rebuilt in order: drip edge, ice and water shield along the eaves and in valleys, synthetic underlayment over the rest, new flashing at walls and chimneys, starter strip, the field shingles or metal panels, and finally ridge caps and ventilation.
Done properly, that sequence is what gives you a roof that sheds water for decades. Skipped steps, like reusing rusted flashing or leaving out ice and water shield at the eaves, are the usual reasons a new roof leaks in its first winter.
What are the signs it is time to replace your roof?
- The shingles are 20 years old or more, or nobody knows when they were installed.
- Shingles are curling at the edges, cupping in the middle, or cracking across the tab.
- Large patches have lost their granules and look smooth or shiny.
- You have had several separate leaks in the last few years.
- The roof deck feels spongy underfoot or sags between rafters.
- An inspection after hail found damage across most slopes, not just one area.
One leak on an otherwise healthy roof usually calls for a repair. Widespread wear points to replacement.

Which roofing material should you choose?
Most Wichita homes are roofed with asphalt shingles, but the hail risk has made upgrades more common. Here is how the main options compare.
| Material | Hail resistance | Up-front cost | Worth knowing |
|---|---|---|---|
| Standard architectural shingles | Basic | Lowest | The default choice. Granule loss and bruising after large hail are common. |
| Class 4 impact-rated shingles | Higher (passes UL 2218 Class 4 steel-ball test) | Moderate | Some insurers discount premiums. Ask your agent before choosing. |
| Standing seam metal | High against punctures, may dent | Highest | Very long life. Check whether your policy excludes cosmetic dents. |
| Stone-coated steel | High | High | Looks like shingle or shake. Fewer installers locally. |
Our guide to Class 4 impact-resistant shingles goes deeper on the trade-offs, and the metal roofing page covers panel styles.
What affects the cost and timeline?
Roofers price replacements by the "square," which is 100 square feet of roof surface. Your quote will depend on:
- Size and shape. Hips, valleys, dormers and skylights add labor and waste.
- Pitch. Steeper roofs need safety equipment and slow the crew down.
- Layers to remove. Two or three old layers mean more labor and more dump fees.
- Decking repairs. These are often priced per sheet, because nobody knows how many are bad until the old roof is off.
- Material and ventilation upgrades. Impact-rated shingles, metal, ridge vents and new gutters all change the total.
- Permits. Wichita reroof permits through MABCD are $0.05 per square foot (minimum $50, maximum $1,500). Other towns set their own fees.
Ask for a written estimate that lists each of these separately, including the per-sheet decking price, so there are no surprises on tear-off day.
How should you prepare for replacement day?
- Move cars out of the garage and driveway, and leave room for a dumpster or trailer.
- Take down wall hangings and fragile items on top-floor walls. Hammering shakes the framing.
- Cover belongings in the attic with old sheets to catch dust and nail tips.
- Mark sprinkler heads, septic lids and anything in the yard you want protected.
- Plan for pets and small children to be elsewhere during tear-off.
When does a replacement become urgent?
If hail or wind has left the roof open in several places, or a large section has lost shingles entirely, it may need temporary protection before the replacement can be scheduled. Ask the roofer about tarping on the first call. Our emergency roof repair page covers what to expect.
Questions people ask
How long does a roof replacement take in Wichita?
Most single-family homes take one to three days once materials are delivered. Steep or cut-up roofs, rotten decking and storms that pause the work add time. After a major hail event, the wait to get on a roofer's schedule is often longer than the job itself.
Do I need to be home during the replacement?
Not usually, but someone should be reachable. The roofer may find rotten decking that needs your approval to replace, and pets are happier away from the noise.
Can new shingles go over my old ones?
Some codes allow a second layer, but a full tear-off is usually the better choice. It lets the roofer inspect and repair the deck, and many manufacturers tie their best warranties to a tear-off. Ask what your local code allows.
What does a roofing permit cost in Wichita?
For Wichita and unincorporated Sedgwick County, MABCD's published roofing permit fee is $0.05 per square foot, with a $50 minimum and a $1,500 maximum. Suburbs and other counties set their own permit process and fees.
Which roof lasts longest in Kansas weather?
Metal and impact-rated shingles hold up best against hail. Standard shingles cost less up front. The right choice depends on your budget, how long you plan to stay and whether your insurer gives a discount for impact-rated roofing.